Lenovo TD200 - ThinkServer - 3809 Hardware Maintenance Manual page 176

Hardware maintenance manual
Hide thumbs Also See for TD200 - ThinkServer - 3809:
Table of Contents

Advertisement

5. Touch the static-protective package that contains the new DVD drive to any unpainted metal surface on
the server; then, remove the DVD drive from the package and place it on a static-protective surface.
6. Follow the instructions that come with the drive to set jumpers or switches, if there are any.
Note: You might find it easier to install the new drive from the front and then attach the cables.
7. Align the holes on the blue optical drive rails with the pins on the side of the drive and snap the optical
drive rails onto the drive. Align the rails on the DVD drive with the guides on the drive bay and slide the
drive into the drive bay until it locks into place.
1
EMC shield
2
Optical drive
3
Optical drive rails
8. Reconnect the power and signal cables to the drive.
9. Make sure that the signal cable is routed through the plastic slot on the bottom of the chassis underneath
the fan cage assembly so that it does not block the airflow to the rear of the drives as shown in the
following illustration:
168
ThinkServer TD200 Hardware Maintenance Manual

Advertisement

Table of Contents
loading

Table of Contents