Toro Diesel Z Master Service Manual page 52

Table of Contents

Advertisement

11. Install the front engine shield assembly (Fig. 110).
Fig 110
12. Install a cable tie securing the throttle cable to the
fuel tank inlet fi tting. Trim the excess (Fig. 111).
Fig 111
Z580/Z593/Z595 Diesel Service Manual
13. Install the knob onto the throttle control assembly
(Fig. 112).
IMG_7895
14. Install 4 screws securing the control panel to the left
hand fuel tank (Fig. 113).
IMG_7835
15. Connect the negative battery cable to the battery
terminal.
16. Lower the seat.
CHASSIS
Fig 112
IMG_7888
Fig 113
IMG_7887
3
3-29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z580-dZ593-dZ595-d

Table of Contents