Toro Diesel Z Master Service Manual page 120

Table of Contents

Advertisement

7. Verify the restrictor valve on the hydraulic fl ow tester
is in the fully "Opened" position (Fig. 344).
Fig 344
8. Start the machine. Run it for approximately 5
minutes to warm the oil in the hydrostatic system.
9. Release the parking brake and bring both levers to
the inside neutral position. Set the engine throttle to
full RPM.
Z580/Z593/Z595 Diesel Service Manual
HYDRAULIC SYSTEM
10. Stroke the left hand hydrostatic lever fully forward.
Very slowly, rotate the "T" handle of the adjustable
fl ow tester restrictor valve until the pressure gauge
reaches 500 PSI (3447 kPa). The measured fl ow
should be 13 to 15 gpm (49 to 56.8 lpm) (Fig. 345).
PICT-3497
11. With the unit at full engine throttle speed, slowly
rotate the "T" handle of the fl ow tester restrictor
valve clockwise until the pressure gauge reads
approximately 1000 to 1200 psi (6895 to 8274 kPa)
(Fig. 346).
Caution: DO NOT operate the machine for an ex-
tended period of time at the 1200 psi (8274 kPa)
rate.
Fig 345
PICT-3509a
Fig 346
PICT-3509a
4
4-33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z580-dZ593-dZ595-d

Table of Contents