Selecting A Site; Opening The Rack - Compaq ProLiant 5000 Reference Manual

Hide thumbs Also See for ProLiant 5000:
Table of Contents

Advertisement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3-2
Installing the Compaq ProLiant 5000R Server

Selecting a Site

Site selection and installation are explained fully in the Rack Planning and
Installation Guide for Rack-Mountable Compaq ProLiant Servers. Refer to
that guide for instructions on first-time installations or the installation of
additional servers.
WARNING:
equipment, be sure that the leveling feet are extended to the floor and
supporting the full weight of the rack. Each rack should be level and stable.
Racks that are not coupled together require the installation of stabilizing
feet. This must be accomplished before performing any work on the rack.
WARNING:
than one component is extended for any reason. Always ensure that the
rack is adequately stabilized before extending a component outside the
rack. Extend only one component at a time.

Opening the Rack

The front and rear doors of the standard 22U and 42U racks are secured by
handles with keyed locks. To open the door:
1. Push up the handle release cover.
2. Unlock the lock, if necessary.
3. Depress the handle release button (key hole button). The handle will
pop out as it unlatches; turn it clockwise to open the door.
Writer: Compaq Project: Installing the Compaq ProLiant 5000R Server Comments:
To reduce the risk of personal injury or damage to the
Risk of personal injury. The rack may become unstable more
File Name: G-ch3.doc Last Saved On: 4/18/97 5:14 PM

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant 5000r

Table of Contents