Placing or Replacing the server in the rack

!
DANGER :
The Avaya server weighs 47-60 pounds (20-27 kg). Do not replace the server in
DANGER:
the rack by yourself.
To replace the server in the rack:
1. Be sure that the rails are extended and locked into place as shown in the following figure.
Figure 9: Replacing the server in the rack
Figure notes:
1. Place server on rails, slide into place
2. Align the server on the rails and push the server into the rack until it is flush with the rack
(Note 1).
3. Push the two locking levers down to secure the server in the rack (Note 2).
184 Upgrading Avaya Aura™ Communication Manager on Avaya S8xxx Servers
d i
COMP
ACT
s c
1
2
UID
2
1
2. Lock both tabs securely
h3df87ri LAO 101905

Advertisement

Table of Contents
loading

Table of Contents