Verifying Reboot Progress - Avaya S8 Series Manual

Upgrading avaya aura communication manager
Table of Contents

Advertisement

!
CAUTION:
DO NOT CLICK CANCEL past this point. Be patient. If the installation fails, a
CAUTION:
message appears on the Reboot in Progress screen.
Note:
This Web session will be interrupted by the reboot which occurs during the
Note:
upgrade of the primary server. After the reboot, you can continue to use the
Manage Software window without logging in.
4. When the reboot is complete, click Continue to display the Update Tripwire Database
screen. If you selected the install license files option earlier in the process, you are
prompted to install the updated license and Avaya authentication files.
Click Continue to install the license and Avaya authentication files.
5. Clicking Continue again displays the Update Tripwire Database window.
6. Unless instructed in your planning documents to update the tripwire database, select Do
not update the tripwire data base now and click Continue.
7. Click Close.
The Manage Software window closes and returns you to the main menu.
Note:
This Web session will be interrupted by the reboot that occurs during the primary
Note:
server upgrade. After the reboot, the links in the main menu of the Web interface
will not function. Therefore, you must close and reopen the Web browser to
continue with the upgrade procedure.
8. Close the Web browser.
9. Reopen the Web browser and log in.

Verifying reboot progress

To check the reboot process.
1. Click Start > Run to open the Run dialog box.
2. Type command and press Enter to open an MS-DOS window.
3. Type arp -d 192.11.13.6 and press Enter to clear the ARP cache in the laptop. This
command responds with one of the following responses:
The command line prompt when the cache is cleared.
The following message is when the specified IP address does not currently contain an
entry in the ARP cache:
Upgrade tasks
Issue 1 May 2009
91

Advertisement

Table of Contents
loading

Table of Contents