Verifying Reboot Progress - Avaya S8 Series Manual

Upgrading avaya aura communication manager
Table of Contents

Advertisement

!
CAUTION:
DO NOT CLICK CANCEL past this point. Be patient. If the installation fails, a
CAUTION:
message displays on the Reboot in Progress window.
Note:
This Web session will be interrupted by the reboot which occurs during the
Note:
upgrade of the server. After the reboot, you can continue to use the Manage
Software window without logging in.
4. When the reboot is complete, click Continue.
The system displays the Update Tripwire Database screen. If your planning documents
instruct you to enable Tripwire, follow the instructions to reset the signature database.
5. Unless instructed in your planning documents to update the tripwire database, select Do
not update the tripwire data base now and click Continue.
The system displays the Installation Complete screen.
6. Click Close.
The Manage Software window closes and returns you to the main menu.
Note:
This Web session will be interrupted by the reboot that occurs during the server
Note:
upgrade. After the reboot, the links in the main menu of the Web interface will not
function. Therefore, you must close and reopen the Web browser to continue with
the upgrade procedure.
7. Close the Web browser.
8. Reopen the Web browser and log in.

Verifying reboot progress

To check the reboot process.
1. Click Start > Run to open the Run dialog box.
2. Type command and press Enter to open an MS-DOS window.
3. Type arp -d 192.11.13.6 and press Enter to clear the ARP cache in the laptop. This
command responds with one of the following responses:
The command line prompt when the cache is cleared.
The following message is when the specified IP address does not currently contain an
entry in the ARP cache:
The specified entry was not found.
Upgrade tasks for the new standby server (second server)
Issue 1 May 2009
191

Advertisement

Table of Contents
loading

Table of Contents