What is next?

Replace and upgrade components, as required.

Replacing the server

Replace the server only if you are instructed to do so. For activities that are not supported as
field procedures, you must return the server to Avaya for service.
This section summarizes the procedure to replace the server. References are made to specific
component replacement procedures where applicable.
To replace the server
1. If the installed server is functional, perform a full backup of the hard disk as a
2. Shut down the installed server (see "Starting up and shutting down the Avaya
3. Power down the server by unseating it from the back plane. Wait 15 seconds to
4. Disconnect all peripherals from the server.
5. Remove the server from the switch (see
6. Remove the software feature key (dongle) from the defective server, and then install
7. Remove the hard drive from the defective server, and then install it in the
8. Install the replacement server on the switch, and then reconnect the peripherals.
9. Boot the server to the operating system.
10. Run the Configuration Wizard to configure the new hardware.

202i server component diagram

The following diagram shows a completely assembled 202i server.
Avaya CallPilot 202i Server Maintenance and Diagnostics
precautionary measure.
®
CallPilot
server" in the Avaya CallPilot Installation and Configuration Task List).
complete powering down, and then remove the server.
page 80).
it in the replacement server (see
replacement server (see
For instructions, see the CallPilot <switch model> and CallPilot Server
Configuration guide for your switch and server.
Removing the server from the switch
Replacing the software feature key
To remove the hard drive
What is next?
on page 86).
on page 83).