Installing the Avaya S8500 Media Server with an Avaya G650 Media Gateway

Pre-Installation Setup

Maintenance Procedures (555-233-103)—provides information on how to troubleshoot and
replace various components.
Software patching procedures—procedures for installing software patches; available from the
Avaya Support Web site (http://avaya.com/support/) under Software & Firmware Downloads.
The following information is included in this installation procedure:
Pre-Installation Setup
Avaya S8500 Media Server features and specifications
High level overview of installation process
Downloading license and Avaya authentication files
Mounting hardware in the rack
Configuring and connecting the hardware
Installing the G650 Media Gateway
Installing the G700 Media Gateway
Installing the G350 Media Gateway
Installing the main distribution frame
Connecting the media gateway to the main distribution frame
Connecting to the customer's network
Installing and wiring telephones and trunks
Connecting to the IP server interfaces
Completing the installation administration
Accessing the media server
Testing the complete configuration
Troubleshooting an installation
Pre-Installation Setup
The pre-installation team should have done the following tasks. If they were not all done, do not continue
with the installation.
Verify that the open, customer-supplied, EIA-310D (or equivalent) standard 19-in. (48-cm) 4-post
equipment rack(s) is(are) properly installed and solidly secured. Make sure that the screws that
come with the racks are there.
Verify that the rail kits, required to support the very heavy UPSs, are installed on the rack or
available for installation. For information on installing the rails, refer to the documentation that
comes with the rail kits.
Verify that the equipment rack(s) is(are) grounded per
Verify that cabling for the TN2312BP Internet Protocol Server Interface (IPSI) circuit packs is
labeled and run from the control hardware rack to the port networks or that appropriate
connectivity is provided.
26
Installing the Avaya S8500 Media Server with an Avaya G650 Media Gateway
on page 26
on page 30
on page 38
on page 51
on page 100
on page 165
on page 163
on page 170
on page 229
on page 232
on page 222
on page 285
on page 291
on page 298
on page 320
on page 28
on page 33
on page 185
Approved
Grounds.
December 2003

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G650

Table of Contents