Omron CJ1W-EIP21 Operation Manuals page 167

For nj-series cpu unit. cj-series ethernet/ip units
Hide thumbs Also See for CJ1W-EIP21:
Table of Contents

Advertisement

 Confirming the Connections Settings
1
An overview of the connections that were set in the Register Device List is displayed in the Con-
nections Tab Page.
2
Click the OK Button. The following kind of diagram is displayed.
3
Repeat the connections setting procedure until all of the connections are set.
Precautions for Correct Use
Precautions for Correct Use
After you have made all of the settings, always click the OK Button before you close the Edit
Device Parameters Dialog Box. If the Cancel Button is clicked and the dialog box is closed, the
new settings are discarded.
4
If the tag set's size is changed in either the originator or target after the connection was set, the
size will not match the other node and a parameter data mismatch will occur. In this case, if you
change the connection settings, be sure to check the connections. (Refer to 7-2-16 Checking
Connections.)
CJ-series EtherNet/IP Units Operation Manual for NJ-series CPU Unit (W495)
7 Tag Data Link Functions
Indicates the IP address
of the originator where the
connection was set.
7
7-37

Advertisement

Table of Contents
loading

Table of Contents