NETGEAR M4200 Software Administration Manual page 661

M4200 and m4300 series prosafe managed switches
Hide thumbs Also See for M4200:
Table of Contents

Advertisement

b. Select the check box for Group ID 1.
1 displays in the Group ID field of the table heading.
c. From the Link Action menu, select Link Down.
d. Click the Apply button.
Your settings are saved.
2.
Configure port 1/0/1 as an upstream port.
a. Select System > Link Dependency > Link Dependency Interface Configuration.
A screen similar to the following displays.
b. Select the check box to the left of interface 1/0/1.
1/0/1 displays in the Interface field of the table heading.
c. From the Upstream Interface menu, select True.
d. Click the Apply button.
Your settings are saved.
3.
Configure port 1/0/1 as an upstream port.
a. Select System > Link Dependency > Link Dependency Interface Configuration.
Managed Switches
Link Dependency
661

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M4300

Table of Contents