•
•
27. Install the upper radiator hose (AI and heater hoses
IBI.
28. Push the engine control module IECMI connectors
through the bulkhead, then install the grommet IAI.
- - -
-::::.;::;-
- - = - = = : - : : - - - =
D
B
29. Install the harness clamps IBI.
30. Connect the ECM connectors IAI and main wire
harness connector (B).
B
31. Install the throttle cable Isee page 11-1641, then
adjust the cable (see page 11-1631.
A
32. Install the cruise control cable Isee page 4-441, then
adjust the cable (see page 4-451 .
33. Install the brake booster vacuum hose IAI and the
evaporative emission (EVAPI canister hose IBI.
34. Install the fuel line Isee page 11-1501.
Icont'dl
5-13