To Schedule On Demand Overwrite
A TCP/IP network-connected device can be set to overwrite image data on a daily, weekly, or monthly
basis. To schedule a daily overwrite, perform the following steps.
Note:
To configure this feature or these settings access the Properties tab as a System
Administrator. For details, refer to
1.
From the Properties tab, click on the [Security] link.
2.
Click on the [On Demand Overwrite] link.
3.
Select [Scheduled] in the directory tree.
4.
In the On Demand Overwrite > Scheduled page:
a.
From the [Frequency] drop-down menu, select the frequency for the overwrite to occur.
If [Daily] is selected, specify the time for the Overwrite in [Time] (24-Hour Clock). The device
b.
will be taken offline each day at the time specified to perform the overwrite.
If [Weekly] is selected, select a day in the week for [Day of Week]. For [Time] specify the
time for the overwrite to run on that day of the week.
If [Monthly] is selected, select a day between 1 and 28 for [Day of Month], for [Time]
specify the time for the for the overwrite to run on that date of the month.
c.
Select either [Standard] or [Full] overwrite for Type.
d.
Click on the [Apply] button.
e.
Click on the [OK] button when you see the message "Properties have been successfully
modified".
Access Internet Services as System Administrator
Xerox WorkCentre 5735/5740/5745/5755/5765/5775/5790