6. Wait until the PVR 6000 is finished rebooting the new software.
7. On the front panel, verify that the new version is installed.
A.2.2.2
Loading Software Version through PVR 6000 BOOT
Application
When the PVR 6000 is shut down during software download, the PVR 6000 start
up sequence is set with the boot application. Perform the following:
1. Stop the previous Hyper Terminal sending process and restart standard
2. When the PVR 6000 starts the BOOT application, the following hyperterminal
Figure A-17: IRD Boot Application Starts
The following screen displays the PVR 6000 Boot Software download menu:
Page A-16
communication with the IRD.
window is displayed.
User Manual
Appendix A
Software Download
(Rev. 4.1/ SW v1.60/ December 2006)