Download Print this page
Harmonic ProView 7000 Installation Manual
Hide thumbs Also See for ProView 7000:

Advertisement

Quick Links

ProView
7000
RELEASE 3.2
Installation Guide
Rev. A

Advertisement

loading

Summary of Contents for Harmonic ProView 7000

  • Page 1  ProView 7000 RELEASE 3.2 Installation Guide Rev. A...
  • Page 2: Safety Precautions

    Do not move or ship equipment unless it is correctly packaged in its original wrapping and ■ shipping containers. Only Harmonic trained personnel can perform service and maintenance. ■ To prevent lightning damage, ground the unit according to local regulations.
  • Page 3 Ensure sufficient space behind the rack for easy access for installation and maintenance. Rack mounting requires the use of L shape slides, available from Harmonic. The amount of units installed in a rack is a function of the units’ power consumption and heat dissipation. Address Harmonic support for calculating the maximum load on the rack.
  • Page 4 Consider if other devices in the rack use airflow in the opposite direction. Consider that the amount of units installed per rack is a function of power requirements and heat dissipation. Address Harmonic support for calculating the maximum load on the rack. To mount the 19"/42U rack with the ProView units: 1.
  • Page 5: Electrical Power Connection

    Überstromschutz installiert ist. Stellen sie sicher, daß eine Sicherung oder ein Unterbrecher von nicht mehr als 240 V Wechselstrom, 20 A (bzw. in den USA 120 V Wechselstrom, 20 A) an den Phasenleitern (allen stromführenden Leitern) verwendet wird. © 2013 Harmonic Inc. ProView 7000 r.3.2, Rev. A...
  • Page 6: Connecting The Cables

    4300 North First St. San Jose, CA 95134, U.S.A. T +1 408 542 2500 F +1 408 490 6770 www.harmonicinc.com © Copyright September 201 3 Harmonic Inc. All rights reserved. Manual Part No. MAN-PVR-7K-IG-3.2 © 2013 Harmonic Inc. ProView 7000 r.3.2, Rev. A...