i3 International SRX PRO User Manual page 213

Digital video management system
Table of Contents

Advertisement

Chapter 3. Appendix
13. i³ recommends to configure the following events:
a. Battery Capacity 10% or Less
b. Output Overload (may use the same setting as the Battery Capacity 10% or less event)
c. UPS Over-temperature Condition
14. To configure Command action for the desired events, click on the Command column of the first chosen event.
Green checkmark will be displayed and configuration options will be displayed in the window pane directly below.
Repeat the steps below for Command actions of all desired events.
a. Check off Enable Command Action checkbox
b. Set the Initial Delay: time to 0 min, 0 sec
c. In the Command: field, click Browse...
d. Go to C:\i3Pro Server folder, select ShutdownSRXPro.exe file and click Open
209
Liebert® MultiLink™ Viewer Configuration

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srx-pro playerWebsearch

Table of Contents