Figure 6-1. Powerware Hot Sync Can Bridge Card; Installing Optional Accessories - Eaton Powerware 9390 Installation And Operation Manual

20-80kva
Hide thumbs Also See for Powerware 9390:
Table of Contents

Advertisement

Chapter 6
Figure
6.1
Installing a Powerware Hot Sync
EATON Powerware

Installing Optional Accessories

This chapter contains installation instructions for the following options:
S
Powerware Hot Sync
S
Remote Monitor Panel (RMP)
S
Relay Interface Module (RIM)
S
Supervisory Contact Module (SCM)
CAN Bridge Card
®
As an option, a Powerware Hot Sync
installed to provide connectivity for operational mode control and metering of a
parallel system at any uninterruptible power module (UPM) in the system. In addition,
this card can be used to connect optional system monitoring devices, such as an
RMP, RIM, or SCM, to the UPS.
Figure 6‐1. Powerware Hot Sync
NOTE Only one Powerware Hot Sync
are not supported and will cause system conflicts.
To install a Powerware Hot Sync
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 9, "UPS Operating Instructions," for shutdown instructions.
2.
If not already open, unfasten the front door latch and swing the door open.
3.
Remove the X-Slot cover.
4.
See Drawing 164201603-8 starting on page A-42 for location of the X-Slot
communication bay.
®
9390 UPS (20–80 kVA) Installation and Operation Manual
CAN Bridge Card and parallel system control wiring
®
CAN Bridge Card (shown in Figure 6‐1), can be
®
®
CAN Bridge Card can be installed in the UPS. Multiple CAN cards
®
CAN Bridge Card:
®
S
164201603 Rev 2 www.powerware.com
Plug-in Terminal Block J3
CAN Bridge Card
6-1

Advertisement

Table of Contents
loading

Table of Contents