Eaton Powerware 9390 Installation And Operation Manual page 182

20-80kva
Hide thumbs Also See for Powerware 9390:
Table of Contents

Advertisement

INSTALLATION INFORMATION
REMOVE DEBRIS SHIELD
COVERING EXHAUST GRILL
BEFORE OPERATING SYSTEM.
CONDUIT LANDINGS FOR
X-SLOT CONNECTIONS.
(REMOVE PANELS TO DRILL
OR PUNCH CONDUIT HOLES.)
A-34
EATON Powerware
TOP ENTRY CONDUIT LANDING
FOR AC INPUT AND OUTPUT,
DC INPUT, DC CONTROL, AND
INTERFACE CONNECTIONS.
(REMOVE PANEL TO DRILL OR
PUNCH CONDUIT HOLES.)
TOP VIEW
®
9390 UPS (20–80 kVA) Installation and Operation Manual
BOTTOM ENTRY CONDUIT
LANDING FOR AC INPUT AND
OUTPUT, DC INPUT, DC
CONTROL, AND INTERFACE
CONNECTIONS.
(REMOVE PANEL TO DRILL OR
PUNCH CONDUIT HOLES.)
BOTTOM VIEW
DESCRIPTION:
CONDUIT AND WIRE ENTRY LOCATIONS
DRAWING NO:
164201603-6
REVISION:
A
S
164201603 Rev 2 www.powerware.com
SHEET:
1 of 2
DATE:
091505

Advertisement

Table of Contents
loading

Table of Contents