Preliminary Installation Information

4.2
Unloading the Powerware 9390 UPS Cabinet from the Pallet
EATON Powerware

Installing the UPS System

Installation should be performed only by qualified personnel.
Refer to the following while installing the UPS system:
S
Appendix A contains installation drawings and additional installation notes.
S
Dimensions are in millimeters and inches.
S
Do not tilt the cabinets more than
S
Remove the conduit landing plates to add conduit landing holes as required. Plate
material is 16 gauge steel (1.5 mm/0.06" thick).
S
The cabinets must be installed on a level floor suitable for computer or electronic
equipment.
S
If perforated floor tiles are required for ventilation, place them in front of the UPS.
See Table A on page A-3 for equipment weight and point loading.
S
Details about control wiring are provided in each procedure for connecting options
and features. Drawing 164201603-8 and Table W through Table AC starting on
page A-42 identify the control wiring terminations.
To install a UPS cabinet, perform the procedures in the following paragraphs.
NOTE When a line-up-and-match UPS system is ordered together with battery cabinets, the first battery
cabinet is supplied with two cosmetic covers. The UPS cabinet, additional battery cabinets, and other ancillary
cabinets are supplied without cosmetic covers.
NOTE When a UPS system is ordered together with battery cabinets for standalone installation, the first
battery cabinet is supplied with two cosmetic covers. Additional battery cabinets are supplied without
cosmetic covers. Cosmetic covers must be ordered for the UPS cabinet and/or other ancillary cabinets.
The UPS cabinet is bolted to a wooden pallet supported by wood skids. To remove
the pallet:
1.
If not already moved, use a forklift or pallet jack to move the cabinet to the
installation area, or as close as possible, before unloading from the pallet. Insert
the forklift jacks between the skids on the bottom of the unit.
The UPS cabinet is heavy. See Table A on page A-3 for weight of cabinets. If unloading instructions are not
closely followed, the cabinet may cause serious injury.
Do not tilt cabinets more than 10° from vertical.
®
9390 UPS (20–80 kVA) Installation and Operation Manual
W A R N I N G
"
10° during installation.
W A R N I N G
C A U T I O N
S
164201603 Rev 2 www.powerware.com