Replacing The Operator Panel; Removing The Operator Panel Power Cable; Replacing The Operator Panel Power Cable - IBM 9114-275 - IntelliStation POWER 275 Service Manual

Service guide
Hide thumbs Also See for 9114-275 - IntelliStation POWER 275:
Table of Contents

Advertisement

Replacing the Operator Panel

Attention:
Licensed programs frequently rely on system information that is stored in the vital product
data (VPD) module on the operator panel. If you replace the operator panel, the system VPD information
(for example the machine type and serial number) is restored to the new VPD module in the new operator
panel. Do not attempt to move the old VPD module to the new operator panel.
To replace the operator panel, do the following:
1. Remove the new operator panel from its packaging.
2. Install the overlay that covers the front serial port connector.
3. Connect the operator panel power cable to the connector on the rear of the operator panel.
4. Carefully slide the operator panel into the operator panel bay until you feel the locking tabs lock in
place.
5. Replace the front bezel as described in "Replacing the Bezel Door" on page 250.
6. Reconnect all system power cables.
7. Return the system to the operating position as described in"Placing the Model 275 into the Service and
Operating Position" on page 248.
8. Start the system as described in "Starting the System" on page 247.

Removing the Operator Panel Power Cable

To remove the operator panel power cable, do the following:
1. Remove the operator panel as described in "Removing the Operator Panel" on page 283.
2. Disconnect the operator panel power cable from the media bay. See the illustrations in "Removing the
Operator Panel" on page 283 and "Replacing the Operator Panel." Note how the operator panel power
cable is routed through the system chassis.
3. Pull the operator panel power cable out of the system.

Replacing the Operator Panel Power Cable

To replace the operator panel power cable, do the following:
1. Place the operator panel power cable into the system. Observe how the operator panel power cable is
routed through the system chassis.
2. Connect the operator panel power cable to the media bay.
3. Replace the operator panel as described in "Replacing the Operator Panel."
284
IntelliStation POWER 9114 Model 275 Service Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Intellistation power 9114 275

Table of Contents