Failover Operation; Before Failover Operation In Secondary Box - American Megatrends StorTrends 1300 User Manual

For the stortrends 1300 storage appliance
Hide thumbs Also See for StorTrends 1300:
Table of Contents

Advertisement

Failover Operation

Go to the SAR page in the secondary box and click on the "Failover" button. After this,
the Role in the Secondary changes to Primary.
Note:
Failover should be always done only in the original secondary box.

Before Failover Operation in Secondary Box

266
StorTrends® 1300 User's Guide (StorTrends iTX version 2.7)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stortrends 2.7Managetrends 2.7

Table of Contents