Power Supply - LEMKEN Saphir 7-B AutoLoad Operating Instructions Manual

Seed drills
Hide thumbs Also See for Saphir 7-B AutoLoad:
Table of Contents

Advertisement

The calculation of the required minimum front ballast and the increasing of the
rear axle load requires that all above mentioned measurements and weights
are known. If they are unknown and cannot be found out, there will be only
one way to avoid overloads:
Please weigh your tractor with mounted and lifted implement to find out
the actual rear axle loading and front axle unloading and that in compa-
rison with the axle loads of the tractor without implement!

3.7 Power supply

For the power supply of the electronic seed drill
control a socket according to DIN 9680 must be
provided at the tractor. If there is no suitable
socket, please order it with the required set of
cables with the part No. 573 5012.
ATTENTION! It is very important to connect
the socket correctly. The pole
15/30 must be connected to the
(+) of the battery and pole 31 to (-) = mass.
18

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Saphir 7-B AutoLoad and is the answer not in the manual?

This manual is also suitable for:

175 3947

Table of Contents