Sign In
Upload
Manuals
Brands
LEMKEN Manuals
Farm Equipment
FieldTronic MegaDrill V02.02 Solitair 25
LEMKEN FieldTronic MegaDrill V02.02 Solitair 25 Manuals
Manuals and User Guides for LEMKEN FieldTronic MegaDrill V02.02 Solitair 25. We have
1
LEMKEN FieldTronic MegaDrill V02.02 Solitair 25 manual available for free PDF download: Operating Instructions Manual
LEMKEN FieldTronic MegaDrill V02.02 Solitair 25 Operating Instructions Manual (207 pages)
Controls
Brand:
LEMKEN
| Category:
Farm Equipment
| Size: 13 MB
Table of Contents
Table of Contents
5
About These Operating Instructions
10
Proper Use
10
Area of Application
10
Operation Terminal
10
Language Setting
11
Symbols Used in the Operating Instructions
12
Hazard Classes
12
Information
13
Environmental Protection
13
Indication of Passages
13
Safety
14
Implement with Tramline Mechanism
14
Safety Equipment
15
Immediately Interrupting Functions
15
Layout and Description
16
Displays and Menus
16
Views and Control Elements
16
Help Function
18
Orientation and Assignment
19
Metering Units
19
Distributors
19
Starting the Program
20
Operating Menu
21
Displays
21
Softkeys
24
Information
27
Error Log
28
Counters
30
Sensors
32
Power Supply
35
Software Versions
36
Seed Pipe Monitoring
37
Metering Motors
41
Locking Motors
42
Adjustments
43
Calibration
45
Tramline Mechanism
47
Distribution Rate
49
Day/Night Mode
50
Monitoring
51
Speed of Travel
52
Fan Speed Monitoring
56
Residue Drainage
57
Weighing Unit
58
Isobus
59
PTO Shaft Monitoring
66
Sound
67
Interval Tramline Mechanism
68
Maize Mode
69
Service
69
Driving on Public Roads
70
Switching off the Work Light
70
Switching off the Operation Terminal
70
Preparations Prior to Operation
71
ISOBUS and Universal Operation Terminal (UT)
71
Selecting a Different Operation Terminal
71
Miniview in the CCI.command
73
Resetting the Counters
74
Using Weighing Device
75
Setting up Monitoring of the Remaining Quantity
75
Resetting Counter of the Weighing Device
76
Setting up Fan Monitoring
77
Setting up PTO Shaft Monitoring
79
Using the Tramline Mechanism
81
Switching Tramline Mechanism on and off
82
Creating Tramlines Specific to the Order
82
Automatic Tramline Mechanism (Tramlinecontrol)
84
Distributor Configuration
87
Setting up the Interval Tramline Mechanism
91
Setting Monitoring of the Forward Speed
94
Change Speed Signal
95
Setting up Speed Signal on the Implement Side
96
Setting up the Speed Signal on the Tractor Side
97
Setting up Simulated Forward Speed
98
Calibration
99
Start Calibration Test
100
Setting Distribution and Specific Weight
101
Setting up Individual Distribution
105
Setting the Target Distribution Rate
106
Converting the Distribution Rate (Seeds/M² > Kg/Ha)
107
Setting the Forward Speed
109
Continuing the Program
109
Preparation before the Calibration Test
110
Running Metering Device at Calculated Chamber Size
110
Starting the Calibration Test
113
Entering the Weight
115
Calculation of the Operating Speed
115
Ending the Program
118
Result for the Calibrated Product (Seed/Fertiliser)
119
Repeating Calibration Test
120
Setting the Distribution Rate
121
Changing the Distribution Rate
122
Changing the Distribution Rate Setting
122
Start Metering
123
Switching Track Manually
124
Operation with Precision Seed Drill
126
Activating Maize Mode
126
Switching on Section Control Azurit
127
Operation
131
Switching between Day and Night Mode
131
Sound Settings
132
Checking the Status
133
Messages
134
Operating Modes
134
Switching Metering Units
135
Observing the Speed Signal
135
Immediately Switching off Metering Motors
136
Procedure for Messages
137
Displaying and Eliminating Messages
137
Temporarily Hiding Message
139
Trace-Marker
139
Activating and Deactivating Alarm Functions
140
Switching the Work Lighting on and off
144
Operating the Filling Screw
144
Distribution
145
Changing the Distribution Rate
145
Permanently Switching off Metering Units
146
Manually Switching the Metering Units
147
Lifting and Lowering the Harrow
150
Automatic Mode
150
Manual Mode
151
Changing the Coulter Pressure
151
Cleaning and Care
152
Discharging Remaining Quantity
152
Starting the Program
152
Running Metering Device at Largest Chamber Size
153
Starting the Drainage
155
Ending Drainage
157
Running Metering Device at Smallest Chamber Size
158
Configuration and Calibration
160
Calibration Value Pulse Wheel and Radar
160
Entering Calibration Value
160
Calibrate Signal over Distance
161
Calibrating the Locking Motors
163
Locking Motor Defective
165
Troubleshooting
166
Messages
166
Diagnostic List
167
Malfunctions
167
Warnings
170
Notes
187
Fuses
189
Position of the Fuses
189
Changing Fuses
190
Annex
192
Tramline System
192
Overview of Tramline Rhythm
192
Uneven, Whole-Number Rhythm
197
Even, Whole-Number Rhythm
198
Even, Whole-Number Rhythm, in Two Passes
199
Half Rhythm
201
One-Third Rhythm
203
Index
205
Advertisement
Advertisement
Related Products
LEMKEN iQblue MegaDrill V02.03 Solitair 25
LEMKEN Vega 12
LEMKEN VARIOPACK FE
LEMKEN VariTansanit
LEMKEN VariOpal
LEMKEN Vari-EuroPlough
LEMKEN VariDiamant 10
LEMKEN VariDiamant 10 X
LEMKEN VariDiamant 10 X OF
LEMKEN VariTitan 10
LEMKEN Categories
Farm Equipment
Tiller
Drill
Paint Sprayer
Controller
More LEMKEN Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL