HANDLING AND INSTALLATION
WARNING: Air inlets are required in
the room where the appliance is installed to
ensure a proper operation of the appliance
and to exchange the air in the room.
WARNING: The air inlets should be of
appropriate size, protected by gratings, and
placed so that they cannot be obstructed.
WARNING: Those authorised to carry
out the connection operation must have ex-
perience acquired and certifi ed in the speci-
fi c sector, in accordance with current legisla-
tion in the appliance's installation country.
The connection must make to the proper
standards and must comply with all the rele-
vant regulations and legislation.
When the connection has been made, before
making the appliance operational, do a ge-
neral inspection to make sure there are no
gas leaks.
To make the connection, connect the mains
line to the appliance's connection pipe, fi tting
a shut-off tap (A) , to allow the gas supply to be
cut off when necessary.
WARNING: The tap (A), not supplied
with the appliance, must be installed in an
easily accessible position and its status (on
or off ) must be obvious at a glance.
3433210_inst_GB
ROOM VENTILATION
GAS CONNECTION
IMPORTANT: The gas supply pipe
must comply with the national requirements
in force and must be periodically checked
and replaced if necessary.
HAZARD: Do not connect the appli-
ance to the gas distribution system contain-
ing carbon monoxide or other toxic compo-
nents.
WARNING: The gas feed pipe must
not be longer than 2 metres.
ENGLISH
A
11