Testing Of The Appliance - Angelo Po 0N1CP1GL User Manual

Pasta cooker
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 27
HANDLING AND INSTALLATION
WARNING: Before it is put into servi-
ce, the system must be tested to check the
operating conditions of every single compo-
nent and identify any malfunctions. In this
stage, it is important to check that all health
and safety requirements have been com-
plied with in full.
To test the system, make the following checks:
)
Turn on the gas supply tap and check that
the connections are right;
)
Check that the mains gas is the same as that
used for commissioning of the appliance,
and carry out the conversion procedure if
necessary (see page13).
3433210_inst_GB

TESTING OF THE APPLIANCE

)
)
)
)
)
After testing, if necessary instruct the user in all
the skills necessary for putting the appliance
into operation in conditions of safety, in ac-
cordance with legal requirements.
Check that the burner is switching on cor-
rectly and its combustion;
Check the gas pressure and fl ow rate and ad-
just them to the maximum setting (see pages
6) if necessary;
Check that the safety thermocouple is work-
ing correctly;
Check that there are no gas leaks;
Check that the nameplates specify the cor-
rect gas for the country of use.
ENGLISH
15

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

0t1cp1gl1n1cp2gl1t1cp2gl

Table of Contents