Huawei iSitePower-M MAP05A1 User Manual page 219

Hide thumbs Also See for iSitePower-M MAP05A1:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
Table B-2 Definition of the stripping length of cables for a parallel box (parallel
system scenario)
No
.
1
2
3
4
5
Issue 06 (2023-04-24)
One End
Other End
AC parallel
AC PDC (customer
box
side)
AC parallel
AC input port
box
AC parallel
AC output port
box
AC parallel
PDB (customer
box
side)
AC parallel
Site ground bar
box
(customer side)
Copyright © Huawei Digital Power Technologies Co., Ltd.
B Preparing Cables and Terminals
1
L wire: 120 mm
N wire: 120 mm
PE wire: 140 mm
L wire: 410 mm
N wire: 340 mm
PE wire: 240 mm
L wire: 115 mm
N wire: 220 mm
PE wire: 370 mm
L wire: 300 mm
N wire: 325 mm
PE wire: 580 mm
N/A
2
L wire: 16 mm
N wire: 14 mm
PE wire: 14
mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
L wire: 12 mm
N wire: 7 mm
PE wire: 7 mm
L wire: 16 mm
N wire: 14 mm
PE wire: 14
mm
14 mm
210

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m mab05b1

Table of Contents