Installing Parallel Communications Cables - Huawei iSitePower-M MAP05A1 User Manual

Hide thumbs Also See for iSitePower-M MAP05A1:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual

10.7.4 Installing Parallel Communications Cables

● Before installing parallel cables, set the same output parameters for the master
● The address DIP switches take effect only after the devices are restarted. Set
● When installing parallel power communications cables, install termination
● The length of a single communications cable cannot exceed 3 m.
● A parallel power communications cable is installed in the same way as a
Procedure
Step 1 Power on the iSitePower-M systems and set the same output parameters for the
master and slave products.
Step 2 Power off the iSitePower-M systems and set address DIP switches for the master
and slave products.
Scenario
Par
all
el
pr
od
uct
s
Step 3 Install parallel power communications cables.
Issue 06 (2023-04-24)
NO TICE
and slave products, and then correctly set the address DIP switches for the
master and slave products.
the DIP switches when the devices are powered off (AC and DC inputs are
disconnected, and the devices are shut down by pressing the black start
button).
resistors at the first and last modules. The termination resistors are delivered
with the product.
battery module communications cable.
DIP
Switch
Master
1
Slave1
2
Slave2
3
Copyright © Huawei Digital Power Technologies Co., Ltd.
Pin 1 (M/S)
Pin 2 (A)
ON
OFF
OFF
ON
OFF
OFF
10 Electrical Connections
Pin 3 (B)
Pin 4 (C)
OFF
OFF
OFF
OFF
ON
OFF
153

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m mab05b1

Table of Contents