6.3 PV+Mains+ESS

Working Logic
1.
Issue 06 (2023-04-24)
Maximize PV Consumption:
a.
When the mains is available:
NO TE
When the ESSs are powered on for the first time and the lithium battery SOC is
greater than the value of Backup Power SOC(%), the PV system and ESSs
supply power to loads, and the ESSs discharge to the value of Backup Power
SOC(%).
i.
The mains supplies power to loads. The PV system charges the ESSs
(the ESSs do not supply power to the loads in this case). After the
ESSs are fully charged, the mode switches to ii.
ii.
The PV system and the ESSs supply power to the loads. When the
ESSs discharge to the value of Backup Power SOC(%), the mode
switches to i.
b.
When the mains is unavailable:
i.
When the lithium battery SOC is greater than the value of End-of-
Discharge SOC for Lithium Batteries(%), the PV system and ESSs
supply power to loads (when the PV power is greater than the load
power, the PV system supplies power to the loads and charges the
ESSs). When the ESSs discharge to the value of End-of-Discharge
Copyright © Huawei Digital Power Technologies Co., Ltd.
(D) PDB
(I) AC PDC
(L) FusionSolar Smart PV
Management System
6 Application Scenarios
(E) Load
(J) Router
(M) FusionSolar app
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m mab05b1

Table of Contents