10.10.2 Arranging Cables

Check that the cables are correctly connected. Then fasten the cables to the
corresponding cable slots.
Figure 10-71 Cable hole distribution

10.10.3 Subsequent Operations

Procedure
Step 1 Close the maintenance compartment door.