7.1.3 Determining the Installation Position

Installation Angle Requirement
The battery can be floor-mounted and wall-mounted. The installation angle
requirement is as follows:
Installation Position Requirements
Installation Space Requirements
Installation Dimensions
Reserve sufficient clearance around the product for installation and heat
dissipation.
Issue 06 (2023-04-24)
Tools and Instruments
Dust mask
Do not install the battery at forward tilted, back tilted, side tilted, horizontal,
or upside down positions.
Install the battery on a solid brick-concrete structure or concrete wall or floor.
If other types of walls and floors are used, they must be made of fire-
retardant materials and meet the load-bearing requirements of the
equipment.
The bearing capacity of the ground must be greater than or equal to 500
2
kg/m
.
During installation, ensure that there is no other devices (except related
Huawei devices and awnings) or flammable or explosive materials around the
batteries. Reserve adequate space for heat dissipation and safety isolation.
When the battery is mounted on a wall, do not place any objects under the
battery.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Protective shoes
7 System Installation
-
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isitepower-m mab05b1

Table of Contents