Huawei iSitePower-M MAP05A1 User Manual page 106

Hide thumbs Also See for iSitePower-M MAP05A1:
Table of Contents

Advertisement

iSitePower-M (MAP05A1, MAB05B1)
User Manual
No.
One End
2
Ground
point
3
COM and
dry contact
ports
4
AC parallel
box
5
AC parallel
box
6
AC parallel
box
7
AC parallel
box
8
AC parallel
box
Issue 06 (2023-04-24)
Other End
Type
Site ground
Outdoor single-core
bar
copper cable
(customer
side)
Genset
Outdoor shielded twisted
control
pair cable (eight cores)
signal/ATS
detection
signal
AC PDC
Outdoor three-core copper
(customer
cable (L/N/PE)
side)
AC output
Outdoor three-core copper
port
cable (L/N/PE)
AC input port
Outdoor three-core copper
cable (L/N/PE)
PDB
Outdoor three-core copper
(customer
cable (L/N/PE)
side)
Site ground
Outdoor single-core
bar
copper cable
(customer
side)
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Preparing Cables
Recommended
Specifications
Main PE cable: 4–6 mm
(same as the cross-sectional
area of the AC input power
cable)
● Conductor cross-
sectional area: 0.2–1
2
mm
● Cable outer diameter:
6.3–7.5 mm
● Conductor cross-
sectional area: 25 mm
● Cable outer diameter:
16–26 mm
● Conductor cross-
sectional area: 4–6 mm
● Cable outer diameter:
13.7–16.9 mm
● Conductor cross-
sectional area: 4–6 mm
● Cable outer diameter:
13.7–16.9 mm
● Conductor cross-
sectional area: 25 mm
● Cable outer diameter:
16–26 mm
● Conductor cross-
sectional area: 25 mm
● Cable outer diameter: 8–
11 mm
2
2
2
2
2
2
97