iSitePower-M (MAP05A1, MAB05B1)
User Manual
Parameter
Operating Mode
Backup Power
SOC(%)
Figure 6-10 Setting lithium battery parameters
Networking Scenarios
Figure 6-11 Single system networking (dashed boxes indicating optional
components)
Issue 06 (2023-04-24)
Description
Maximize PV Consumption: PV power is preferentially
used for loads.
Maximize Power Backup: The mains is preferentially used
to supply power to loads. At the same time, the mains and
PV system charge the ESSs until the ESSs are fully charged.
This parameter is available only when Operating Mode is
set to Maximize PV Consumption.