3
Unpacking
3.1
Unpacking the STP Pump and the STP Control Unit
Check the following before unpacking the STP pump and STP control unit.
Check the package for bruises, breakage, wetness, and other.
1)
If there is any abnormality/error or it is judged necessary to return the product, contact
Edwards or the selling agency.
Check the contents of the package.
2)
See Section 3.2, "Accessories".
◇ Be careful not to scratch the flange of the STP pump.
Before installing the STP pump, check whether or not there are scratches on the
surface.
◇ It is recommended to keep the packaging materials, such as the corrugated
fiberboard container and cushioning material for possible reuse.
3.2
Accessories
Item
STP control unit
Primary power cable
*1
STP connection cable
*1
Ground cable
*1
Inlet port cover
Outlet port cover
STP connector cover
Spare fuses 250V, 10A
Instruction Manual
Table 3.2 Accessories for Chemical Specific Pump (Type C)
The accessories listed below are supplied to the chemical specific pump (type C) in addition
to the accessories in Table 3.1.
Item
Blank flange for purge port
Clamping ring for purge port
O-ring washer for purge port
*1
: The standard cable length is 3 m.
*2
: JIS
STP-L301/L451 Series Instruction Manual
Table 3.1 Accessories
Q'ty
1
1
With a single-side connector
1
With both-side connectors
1
With both-side crimp-type terminal lugs
1
1
1
2
F1, F2 (rear panel)
1
Q'ty
1
KF
10
*2
1
KF
10
*2
1
KF
10
*2
3-1
Remarks
Remarks