Doosan HM 1000 Installation Manual page 99

Hide thumbs Also See for HM 1000:
Table of Contents

Advertisement

HM 1000/1250
5) Attach the floor work to the installed oil pan.
Floor
Work
6) Place down the APC Set-Up switch box and
beam sensor wire on the right oil pan.
7) Install both APC Guards.
APC
Guard
8) Install both APC front guards.
Front
Guard
HM1000ISE99
Floor
Work
APC
Guard
Front
Guard
97

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hm 1250

Table of Contents