Doosan HM 1000 Installation Manual page 95

Hide thumbs Also See for HM 1000:
Table of Contents

Advertisement

HM 1000/1250
② Insert the splash-guard wires and hydraulic hose through the duct to the ceiling of the
splash guard.
③ Connect the wires to the terminal box that is
located on the top of the electronic cabinet
and in the side of the splash guard.
④ Place the signal tower vertically, which is
shipped horizontally.
⑤ Install the top cover on the column.
HM1000ISE99
Signal
Tower
93

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hm 1250

Table of Contents