Doosan HM 1000 Installation Manual page 29

Hide thumbs Also See for HM 1000:
Table of Contents

Advertisement

HM 1000/1250
2) Arranging the coolant tank wires
Push in the coolant tank wires, which were tied
up in the front duct of the Z axis by factory
default, through the wiring hole of the Z-axis
bed to the rear duct. Then, arrange them up for
later connection.
3) Arranging APC wires
Pass the wires from the terminal boxes of
APC1 and APC2 through the X-axis bed duct
and the floor duct into the electric cabinet.
Whereas, the wires from the APC manual
operation panel will be set up in the reverse
direction.
4) Arranging the X-axis bed and APC wires
Put in the duct the wires (including two screw conveyor motors), which are either from
the X-axis bed or from APC, and lay them out under the electric cabinet.
5) Arranging the splash guard wires and hoses
Put in order the splash guard wires and hoses on the electric cabinet and ATC.
HM1000ISE99
27