Doosan HM 1000 Installation Manual page 92

Hide thumbs Also See for HM 1000:
Table of Contents

Advertisement

HM 1000/1250
4) Installing the main splash guard
① Hook several ropes to the main splash
guard and lift it up with the crane. Care
must be taken for the balance.
② Loosen the splash guard brackets (x2) that
overlap with APC.
▪ This is to prevent the possible interruption
by APC during the installation. When you
have settled down the main splash guard,
install the brackets back to the original.
③ Put down the main splash guard in the
intended position while avoiding an
interruption or overlap with the operator-
side and ATC-side splash guards.
5) Concatenating the splash guards
① Concatenating the splash guards in the side
Use the concatenating covers to concatenating the sides between main splash
guard, operator-side and ATC-side splash guards.
90
Splash Guard
Concatenating Cover
HM1000ISE99
Splash Guard
Concatenating Cover

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hm 1250

Table of Contents