HM 1000/1250
HM1000ISE99
9) Install the APC Set-Up switch box and beam sensor wire in the right position.
10) When the oil pan and guard are installed properly, proceed with the APC skirt.
APC
APC
Skirt
Skirt
11) Install the connect covers between APC pan and splash guard.
▪ Two on either edges and two in the front of APC
Conner
Cover
Conner
Cover
12) Install the connect covers between APC
guards and splash guards on both sides.
Conner
Cover