HM 1000/1250

2. Transportation

For HM 1000/1250, these models can be dismantled into each unit to facilitate the
transportation of the machine to the plant.
Since each one of the units is heavy weighted and unbalanced, pay attention to keep every
unit balanced and take caution not to damage the covers such as scratches or bents if
using a forklift or crane for transporting purpose.
(1) When the machine is delivered on site, check if every one of the units are all included
in the package based on the packing list.
(2) Use the crane or forklift to move the unit while keeping eye on the balance.
(3) In this process, take caution lest that the wire rope or shackles should impact on the
unit, and adjust the length of the rope as appropriate to prevent it from being
unbalanced.
1) Hooking the ropes to the crane
Column & Column Bed
HM1000ISE99
Table & Table Bed
9