8. Machine Leveling

※ Machine Leveling
As machine leveling has a direct effect on the precision of the machine, it is generally
accepted that machine leveling is done along with the machine precision work. However,
special care must be taken.
▪ Preparations: Magnetic Square Level (150×150, x2), Square (rectangle 320×320), Test

8.1 Preparations for the leveling

1) Remove the bush from the level bolt
① Remove all the anchor nuts from the level bolts.
② Remove all the bushes from the level bolts (on the foundation work units) before
proceeding with the temporary installation.
③ Then, insert the washers only and tighten the nuts half the way.
④ Loosen the nuts on the level bolts by 2~3 turns.
2) Tighten the level bolts on both column bed and table bed by applying even force to each
of them.
▪ This is required so that each of the level bolts contacts on the level block
simultaneously as possible.
3) Remove all the blocks that take place for the temporary installation.
Plain
Washer
Bush
36
Indicator (0.002mm), Magnetic –Stand, Test-Bar, Other Leveling Tools
(Spanner : 24mm, 36mm, 50mm, 58mm), Pipe (1.5m that allows use of
the spanner)
Anchor
Nut
Anchor
Nut
Level-bolt
Fixing Nut