Doosan HM 1000 Installation Manual page 63

Hide thumbs Also See for HM 1000:
Table of Contents

Advertisement

HM 1000/1250
3) Perform the pallet unclamping manually and use the 30mm wrench to loosen NA24 shift
nut. Then, loosen the shift through the cap hole.
4) Use the crane to lift up and remove
C12051171A clamp plate. If this is not
available, alternatively place a wood support in
an appropriate site inside the machine and put
down the plate on it.
5) Loosen the table bolts.
▪ 12-BB16×60
6) Loosen the set-screws (2-BQ12×16) in the side
of the table (pallet base), insert the eye bolt in
that place and hook the rope. While balancing
the table on the rope, hook the rope to the
crane.
▪ Mark the table and table base position before
removing them as this is useful when putting
them back together.
Seat Plate
Nut (NA24)
Shift
HM1000ISE99
Shift
Nut (NA24)
12-Table
Fixing Bolt
Seat Plate
61

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hm 1250

Table of Contents