Table 25: Site Preparation Checklist (continued)
Item or Task
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
Verify that the wall meets the minimum
requirements for the installation of the switch.
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related Topics
88
For More Information
"Rack Requirements for EX3200 and
EX4200 Switches" on page 93
"Cabinet Requirements for EX3200
and EX4200 Switches" on page 94
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX3200 and EX4200 Switches" on
page 96
"Requirements for Mounting an
EX3200 or EX4200 Switch on a
Desktop or Wall" on page 95
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX3200 and EX4200 Switches" on
page 96
General Safety Guidelines and Warnings for EX Series Switches on page 207
General Site Guidelines for EX Series Switches on page 89
Installing and Connecting an EX3200 or EX4200 Switch on page 117
Mounting an EX3200 or EX4200 Switch on page 120
Performed By