COMMON RAIL SYSTEM
Final tightening of high-pressure line
• Tighten the new high-pressure lines (1) to
tightening 60°
with
Angle extension [32]
Special spanner, size 17 [31]
• Tighten the high-pressure lines (1) to
tightening 30°
with
Angle extension [32]
Special spanner, size 17 [31]
• Repeat the same procedure for the other
high-pressure lines
• Tighten the pipe clamp mounting bolts to
124
Final
and
Final
and
if re-using
5 Nm
AE6 3st edition