10 3 6 Control Cable - GE AMX-4+ Technical Manual

Hide thumbs Also See for AMX-4+:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 5

10 3 6 Control Cable

ILLUSTRATION 10-17
CONTROL CABLE ROUTING
2. The cable continues from near clamp point H" and is ty-rapped to the anode
and stator cables at the locations shown in Illustration 10-16 until reaching strap
point G".
3. There is a large loop after strap point G" before the cable enters the bottom of
the vertical column assembly terminal box and is connected to the terminal strip
AMX3 A1 TS1. See Illustration 10-12 and Table 10-1.
The control cable exits the bottom of the terminal box on the rear of the vertical col
umn assembly, passes beneath the anode cable and connects directly into the unit just
below the anode and cathode cables. The cable is loosely draped to accommodate arm
and column movements. See Illustration 10-17.
CLAMP POINT D
STRAP POINT N
10-13
(MODEL 2169360, 2236420 & 2275938 SERIES)
DIRECTION 2173225-100
AMX-4+ SERVICE
STRAP POINT C
CLAMP POINT A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2169360 series2236420 series2275938 series

Table of Contents