Install Battery Compartment Cover - GE AMX-4+ Technical Manual

Hide thumbs Also See for AMX-4+:
Table of Contents

Advertisement

GE MEDICAL SYSTEMS
REV 5
6 15

Install Battery Compartment Cover

ILLUSTRATION 6-5
BATTERY COMPARTMENT COVER INSTALLATION
ARM EXTENDED
LEVEL FLOOR
Note:
CAUTION
1. Place the unit on a level floor. Extend the horizontal arm and rotate it to the front
end of the AMX (vertical-column end). See Illustration 6-5.
BOLTS TORQUED TO
75 IN. LBS. (8.4 N-m)
Distribution of weight is necessary to install the battery compartment cover.
2. Place the remaining Insulator #1 in the compartment opening with cup-shaped
bumps pointing away from you.
The battery compartment cover is an integral part of the Base Assembly. All
six bolts must be in place and torqued to 75 pound-inches (8.4 Newton-met
ers) or the Base Assembly can be warped or cracked.
3. Install battery compartment cover as shown in Illustration 6-5.
4. Remove tape from free ends of all ground cables and connect to ground stud us
ing flat washer and nut.
6-10
(MODEL 2169360, 2236420 & 2275938 SERIES)
DIRECTION 2173225-100
AMX-4+ SERVICE

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

2169360 series2236420 series2275938 series

Table of Contents