Mitsubishi Electric NZ2GF2B1-16D User Manual page 199

Cc-link ie field network remote i/o module
Table of Contents

Advertisement

(b) When "1: Without initial processing" is set
• When the data link is established, Remote READY (RWr0.b11) turns on.
• At the data link establishment, the external I/O function of the I/O module becomes enabled.
Remote READY
(RWr0.b11)
Program
RY0
Module power
supply
I/O module
Processing of the I/O module
External output signal Y0
(3) Setting procedure
1.
Set "Method selection" to "Parameter write".
"CC IE Field Configuration" window  Select a main I/O module in "List of stations".  [CC IE Field
Configuration] 
[Online]  [Parameter Processing of Slave Station]
2.
Set "Initial operation setting" to "0: With initial processing" or "1: Without initial processing".
Initial operation setting
Controlled by the I/O module
Controlled by the program
Data link is
established.
ON
OFF
ON
OFF
ON
OFF
ON
Processing
at start-up
OFF
Output ON
Item
Setting range
• 0: With initial processing
• 1: Without initial processing
CHAPTER 9 FUNCTIONS
197
9

Advertisement

Table of Contents
loading

Table of Contents