Mitsubishi Electric NZ2GF2B1-16D User Manual page 261

Cc-link ie field network remote i/o module
Table of Contents

Advertisement

• When Without initial processing (1) is set
Initial processing request flag (RWr0.b8) does not turn on. The I/O module becomes operable (the update
of external I/O becomes enabled) without Initial processing completion flag (RWw0.b8) being turned on.
When the module is powered on, Remote READY (RWr0.b11) turns on and the initial processing is
completed.
*3
Module power supply
OFF
Initial processing request flag
OFF
(RWr0.b8)
Initial processing completion flag
(RWw0.b8)
OFF
Parameter area
Remote READY
(RWr0.b11)
OFF
*4
External input signal X0
OFF
RX0
OFF
*3
When data link starts at the same time of when the module is powered on
*4
When an external input device connected to X0 is on
Controlled by the I/O module
Controlled by the program
ON
Parameter settings are
read from the internal
nonvolatile memory.
The operation is started
with the setting value A.
ON
ON
ON
(Setting value A)
APPENDICES
A
259