Figure 3-129 Sear Cdl Compile Message; Figure 3-130 Sear Cdl Compile Complete - Siemens GCP5000 Instruction & Installation Manual

Grade crossing predictor for electrified territory (gce)
Table of Contents

Advertisement

DISPLAY MODULE AND OFFICE CONFIGURATION EDITOR
_________________________________________________________________________________________________________
Once all the questions have been answered, the user can compile, the CDL, shown in Figure
3-129 and Figure 3-130.

Figure 3-129 SEAR CDL Compile Message

Figure 3-130 SEAR CDL Compile Complete

NOTE
The SEAR application will not run unless CDL Setup is completed.
CDLs are specific to the crossing applications.
3-83
SIG-00-22-02
JUNE 2022 (Revised September 2022)
Version: B.1

Advertisement

Table of Contents
loading

Table of Contents