Grade crossing predictor for electrified territory (gce)
Table of Contents

Advertisement

DISPLAY MODULE AND OFFICE CONFIGURATION EDITOR
_________________________________________________________________________________________________________
3.1.2.3.10
GCP ATCS COMM Screen
The GCP ATCS COMM screen shows the ATCS Communication status of ATCS Vital
communications links
The left side shows the state of the 15 bits that are transmitted out of the vital comms link.
These may show green (energized) or grey (de-energized).
The right side shows the state of the 15 bits that are received from the neighboring system on
this vital comms link. These may show green (energized) or grey (de-energized).
If the comms link is not in session (grey icon on System View), the Rx bits will all be grey. The
Tx bits may still be green when the link is out of session.

Figure 3-26 ATCS Comms Vital Link Screen

The SEAR tab shows the status of bit received from the SEAR.

Figure 3-27 ATCS Comms SEAR Screen