Siemens GCP5000 Instruction & Installation Manual page 208

Grade crossing predictor for electrified territory (gce)
Table of Contents

Advertisement

SSCC APPLICATIONS & PROGRAMMING GUIDELINES
_________________________________________________________________________________________________________
4.3 Battery Surge Protection and Power Wiring
Battery surge protection for the SSCC is shown in Figure 4-3. The Primary surge protection for
SSCC modules is provided on the SSCC battery (see inside dotted line). The Primary surge
protection for I/O interconnect is provided on lighting surge panels (see paragraph 4.3.1).
Provide power wiring to A80405 SSCC IIIi modules:
via B and N contacts of the respective crossing controller connectors on the
GCP5000 (GCE) front panel.
using poly-jacketed #10 AWG wire (recommended) for DC power and return
between battery surge protection and the GCP5000 (GCE) crossing controller
connectors.
Provide power wiring to the lighting surge panels:
using poly-jacketed #6 AWG wire (recommended) for DC power and return between
the –1 lighting surge panel (A91170-1 or A91181-1) and the crossing gate battery
posts.
using poly-jacketed #10 AWG wire (recommended) for DC power and return
between the –1 lighting surge panel (A91170-1 or A91181-1) and the –2 lighting
surge panel (A91170-2 or A91181-2).
PROPER BATTERY SURGE PROTECTION REQUIRES THAT THE
BATTERY CHARGER OUTPUT BE WIRED DIRECTLY TO THE
OPERATING BATTERY POSTS WHILE A SEPARATE PAIR OF WIRES
RUN FROM THE BATTERY POSTS TO THE SSCC SURGE
PROTECTION (ACROSS THE EQUALIZER) AS SHOWN IN Figure
SIG-00-22-02
Version: B.1
CAUTION
4-4
JUNE 2022 (Revised September 2022)
4-3.

Advertisement

Table of Contents
loading

Table of Contents